Lancaster farming. (Lancaster, Pa., etc.) 1955-current, November 30, 2002, Image 121

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    Thursday, December 5, 2002 11 3“o a plm. 10
Mountain View Farms
S3® 125,280
* High Rise Pullet
Introducing The New
PG Pullet
Feeder
/ Innovative feed trough design
minimizes feed waste
/ Has more capacity to reduce
run time
/ Is very gentle on beaks since there is no chain hidden
under the feed
✓ Reduces mortality and disease - feeder is installed entirely
outside the cage so no peeps can get caught and no
manure gets mixed with feed
Other Equipment Features:
/ New inlet design with jet flow opening to
improve winter ventilation
/ Chore-Tronix Model 40 ventilation
control ties together, fans, heaters and
inlets
Visit neagrl.com , For More Information On These Products
King Construction Building Features:
Authorized
Northeast Agri Systems, Inc.
Store Hours t- * i
agn
systems
INortl
Flyway ftusmess Park
139 A West Airport Road
Utitz.PA 17543
Ph (717)549-2702
* * - ™ I. fcifc J
OPEN HOUSE
/ Rugged poured concrete
walls and curbs
/ McElroy painted steel
siding on inside walls,
outside siding and
roofing
/ Plyco doors
/ Attached manure storage building with three push
through doors and load out ramp
Equipment by
master distributor since 1982
Mon Fn 7 30 am to 4 30 pm
24 Hr 7 Day Repair Service
1-800-673-2580
You're Invited to an
Pine Grove, PA
/■»
✓ Double dipped galvanized cage
bottoms and heavy wire vertical cage
fronts (same as our layer cage)
/ L.B. White heaters with variable output
m
Serving Delmarva
From
Federalsburg, Md
305 University Ave
410-754-9434
Store Hours
7 30 AM - 5 00 PM
Mon -Frl
Introducing
THE NEW
Brood Grow
Nipple
Drinking
System
/ Saves labor - All tiers are winched - Heavy duty winching
system uses 1 3/4” pulleys
/ Reduces maintenance because there are no hoses, glued on
saddles or rubber O rings
/ Economical tri-ply ceiling
/ Georgia Pacific
laminated beams,
3 1/2” xll 7/8”,
narrow profile reduces
manure build up
/ Roof trusses by Rigidply
Rafters
KING CONSTRUCTION CO.
Lancaster Farming, Saturday, November 3(
Capacity
House
Directions from Pine Grove
From the traffic light at the intersection of 125 and 443 take
443 east 5 miles Turn right on Dad Burnham Road Turn
left on Ferrebees Road Turn right on Kemmenng Road
Pullet house is on left
601 Overlay Grove Road, New Holland, PA 17557
717-354-4740
•p/
Sy
4Z Fit. 443
<■ 5 Mile
S/J
<y /
Mountai
View Fan
-» Watch For Signs «-
Building by:
Fern
2002-D1