A26-Lancaster Farming, Saturday, March 23,2002 Penn State Cooperative Extension Capitol Region Dairy Team DO YOU HAVE ENOUGH WATER FOR THE SUMMER? Thomas R. McCarty Extension Agent Water Quality Capitol Region Holes in rock are selling like funnel cakes at the county fair. The folks who make them are ex tremely busy in southeastern Pennsylvania. The folks buying them usually already own one that is proving to be too shallow. I am talking about wells, of course. The water table is reaching re cord low levels in many places. When it drops below the bottom of a homeowner’s well, it causes them an inconvenience. When it drops below the bottom of your farm well, it’s an emergency! The point is, there are only few people depending on the water from a homeowner’s well while there are probably SO to several hundred cows drawing water from your farm well Households can be supplied with water from the grocery store, but your farm cannot. I hope this convinces you to do two things. The first is to make a ' T > MMMMHMMMMMMMMfMMMMtM »4MM< ««<4««««4*«««««4« * « « t « « t « • ( ! 4 4 t 4 t M M M •4««t • » « « # #M « « f f tf« 4 | ♦♦♦ « f ♦.♦ ♦ »♦.♦. ♦. t VAVtl^l plan for a water emergency. The second is to monitor the water level in your welL This will allow you to predict a water shortage far enough ahead to be able to supply water without interrup tion. Let’s look at monitoring your well first I mentioned that groundwater levels are reaching record lows. This year’s window of opportunity for recharge is also closing. Recharge usually oc curs between October and May. After crops begin growing active ly, they effectively prevent rain fall from reaching the water table. They transpire water at rates sufficient to use all rainfall that infiltrates from May to Sep tember. For this reason, I believe moni toring of wells supplying live stock water is an important first step. We will enter the summer at record low levels and the levels will likely fall still farther. We are entering uncharted territory. The object of monitoring is to determine if there is adequate water over the pump intake in the well for uninterrupted water use. I suggest two measurements be made on the same day. The first should be done at the end of a period of minimum use, per haps the first thing in the morn ing. Suppose you measured 50 feet from ground level to water level. The second measurement should occur at the end of a peri od of maximum use. This would typically be after the morning or evening chores are finished. Sup pose this measurement is 150 feet from ground level to water level. Repeat these measurements fin several days to be sure they are representative. If there is little or no difference between these two measurements, the well is high yielding. Significant differences in these two readings is an indi cation that the flow rate of the well is beginning to diminish. To evaluate die measurements we also need to know at what depth the pump intake is located. Let’s suppose it is at the 200-foot level. A morning measurement of SO feet would indicate there is 150 feet of water over the pump. This should make you cheer. A measurement of ISO feet follow ing a heavy use period still leaves us with SO of water covering die pump. This is still adequate, since 10 feet of water should be sufficient to let the pump operate satisfactorily. The difference be tween the two readings, which in this example was 100 feet, should be written down somewhere for monitoring and for future refer ence. The next step is to continue the early morning measurements on a weekly or monthly basis. If this measurement drops to 90 feet and the differential reading stays at 100 feet, the well has now reached the critical point of 10 feet of water over the pump dur ing heavy use. Monitoring the water levels periodically and graphing the readings over time can help you predict when you could potentially expect a serious water shortage problem. tM•M« ‘ > M t Let me list some key points about measuring water depths. First, don’t drop equipment down the well. Bore a hole in a piece of plywood and feed the measuring tape through that. Second, don’t get the tape stuck. There are centering guides along the pipe to make the pipe and wire stand off from the borehole, which makes the job of lowering the tape interesting. Connect a slender weight securely to the tape, and make sure there are no edges or frays that will cause it to get snagged. Don’t use a weight that would be a catastrophe if lost in the well, such as lead, for example. A steel tape coated with carpenter’s chalk makes the water level easy to read. A solid cake kind of chalk works well for this. Finally, the tape and weight should be disinfected before send ing it down the borehole. If you don’t have a bacteria problem, don’t create one. The other important action to take is to develop an emergency plan. What would you do if there were no water tomorrow morn ing? We hope you will never ex perience this. How could you quickly get water to the operation in this emergency? Some important things to con sider are a source of water and a way to get it to the farm, a sani tary storage tank, a second pump to remove water from storage, piping to deliver water-to the ap propriate places, and a method of disinfecting the water. This plan should be reviewed with other people who will be affected, such as the milk sanitarian, the con tractor for feeder animals, em ployees, etc. Longer term planning could include having a back up pump and all the equipment necessary for pulling the pump. Materials to sanitize the well after pump re placement should also be avail able. A possible long-term goal /*<> . ♦ » » ♦ ' % ¥ */♦-*> > could be to have a backup well, especially on a larger operation. Before drilling a well, consult with a hydrogeologist to help se lect a site that is likely to provide a high yield of water. Is the site far enough removed from other wells and possible sources of con tamination? Is it in a convenient location for future expansion? After satisfying these considera tions, the well can be drilled and developed. Developing a well re fers to the procedure used to clean mud from the walls of the borehole and fines from the water bearing zones near the well so that the well can achieve a high yield. Be sure the well is properly cased and protected from surface water contamination. Final con siderations would be providing adequate pipe and wire size for satisfactory pump operation. Also, develop an effective main tenance schedule for the well, es pecially if it remains an occasion al-use well. Consult the following refer ences for additional information; • http://www.crh.noaa.gov/er/ marfc/ Mid-Atlantic River Fore cast Center, a source for weather data. • http://waterdata.usgs.gov/ pa/nwis/current?type= gw USGS site providing water levels in their monitoring wells. • http;// www.dcnr.state.pa.us/topogeo/ Department of Conservation and Natural Resources, which pro vides information about ground water and wells. • http://www.cas.psu.edu Penn State College of Agricultur al Sciences site. Look under Cur rent Issues Drought, for more information. • “Managing Your Well Dur ing a Drought,” a fact sheet available from Penn State Coop erative Extension.