Lancaster farming. (Lancaster, Pa., etc.) 1955-current, October 17, 1998, Image 206

Below is the OCR text representation for this newspapers page. It is also available as plain text as well as XML.

    010-Lancaster Farming, Saturday, October 17, 1998
GRABER SUPPLY
491 Gap Newport Pike
Atglen, Pa. 19310
20 miles East of Lancaster, PA on Hwy 41
or 27 miles North of Wilmington, Delaware
Post & Frame Building Materials
Metal Roofing Sale
• Painted Galvanized 29 GA. #2
• Prime Painted Galvanized 29 GA..„
• Premium Painted Galvalume 29 GA
26 & 29 Gauge
Window Doors
insulation
Overhead Garage Doors
Electric Openers
Trusses
Rural
Economy
MARTIN’S ROOFING 258 Walnut Bottom Rd.
(717) 532-3460 Shipp ensbu r 7257
Pole Buildings
. LOCATION..
★ ★ Manufacturing
Cust m Trim * ★”
800-964-1550
610-593-3500
$40.43 sq.
$43.59 sq.
$46.75 sq.
a
ej
a
For over 30
Lease financing for the farm
oral marketplace
r Buildings
w & used Equipment
Vehicles
800-451-3322
http://www.telmark.com
Fit
Top Cl
BLACK BEAR TRUSS CORP.
TRUSSES BEAR UP",
366 scissors owe "Prompt Delivery"
DOUBLE CANTILEVER
Bottom Chord Overhang
VAULT Slot
UP TO 80’ CLEAR SPAN
STUDIO WITH TWO For Horse Barns • Riding Arenas • Commercial • Residential
BEARING POINTS
For a FREE Quote Call (717) 998-2391 or 1-800-326-9689
RAKE IN YOUR FALL
SAVINGS NOW!
Horse Barn/
Equipment Shed
36 x 60 x 10
$11,950
- Free Brochures
- Free Estimates
- Financing Available
These specials offered for a limited time only. Call us today for details!
:...Te
✓ MSR Lumber
✓ Laser-STRAIGHT
✓ Bear-STRONG
✓ Crane Optional with Delivery
✓ Cellular Phones in all
Delivery Trucks
Hrs: M-F 6am-6pm; Sat. by appt.
CONESTOGA
Buildings
K”*8” GimSKM'
Prime, secondary, structure pipe
Farmers, Manufacturers, Fabrication
Will Cut To Your Size Needs
STEEL TUBING
3V2” Sq 2”x2” Sq
4”x4" Sq 3”x3" Sq
20’ to 24’ Lengths/Vis” to '/<” Thick
IV*" Sq
2V*” Sq
BRICKER S PIPE YARD
A __ _ 1970 Frank Road
7 I 7-ZO I “0095 Chambersburg, PA 17201
Garage
24 x 24 x 8
$5,000
1-800-544-9464
2"x4" Reel
3"x2" Reel
MONO
FLOOI
|R TRUSSES
DUAL SLOPE
(DOUBLE PITCH)
Up To 60’
Clear Span
RAISED CENTER BAY