i2-Lancaster Farming, Saturdai Cl TRUSS PLATE INSTITUTE In the summer of 1954, the Shirk family began to manu facture laminated wood raf ters in their home in Myer stown, Pennsylvania. Before and after school, several sets of rafters were glued and clamped together in the base ment of their house. In time, the family felt that the busi ness needed a name which was truly descriptive of the quality product that they were producing. The name Rigidp ly Rafters was established in 1954 by Chester F. Shirk, owner and operator of this contracting company. In the years that followed, a number of changes and chal lenges occured. 1963 brought the introduction of a new pro duct line, wood roof trusses, and the first crane truck was put into operation in 1964. Recreational Facility: Featuring 90’ And 96’ Span Trusses & Glu-Lam Posts. Post frame Building Package: Lumber, Steel Cladding, Engineered trus ses, Glu-Lam Posts & Glu-Lam Beams. The term “diaphragm action” is no lon ger foreign to the industry, but, there are two questions people most often ask. How does diaphragm action work? and why should I care about diaphragm action? Diaphragm action is a technical way of saying that the roof and ceiling of a build ing are being used to help carry lateral (wind) loads. Diaphragm action is achieved when posts on the endwalls of a building, extend to the top chord of engineered trusses which are connected by purlins two feet orr center. The building must then be covered with a steel cladding and fastened with screws or sheeted with ply wood and nailed, which in turn helps to strengthen the building. Large openings r, January 23, 1993 Call Our Sales Staff TODAY With Your Special Building Requirements And Let Us Design A Post Frame Building For YOU! Telephone: and WOOD ROOF TRUSSES 701 E. Linden St.. RICHLAND, PA 17087 70’xl12’ Storage Facility in the endwalls should have headers installed that are engineered to transfer the load across the opening. Because of the diaphragm action, post sizes, and their embedment depth can be reduced, and the number of knee braces can be reduced or eliminated entirely. This leads to a stronger building for a more economical price. In 1985, the post frame building indus try received yet another benefit, the deve lopement of “The Glu-Lam Post,” which are manufactured in our plant. These posts were tested and approved for use in the post frame construction industry by engineers at The Pennsylvania State University, and Wood Mechanics Per sonnel. These posts can be manufac tured up to 60‘ lengths. Along with their (717)866-6581 Endwall Detail Showing Glu*Lam Posts Extending To Top Cord Of Engineered Trusses And Correct Endwall Bracing For Truss Erection. Improve The Quality Of Your Next Post Frame Building By Specifying Glu-Lam Posts. many benefits, they prove to be very effective in acquiring diaphragm action, because of the possibilities of the longer lengths. We are confident that with our large inventory of post frame building mater ials, efficient manufacturing plants, engi neering and sales personnel, we are well equipped to meet the needs of you, our customer. Everyone at Rigidply Rafters, Inc. is fully committed to serving our customers and providing them with the finest products available. The excellence that we strive for is to show our appreciation for our customers continued loyalty to Rigidply Rafters. You deserve the best! MEMBER In 1971 the business expanded to include yet another market, that being the Post Frame Building Industry. That same year saw Rigidply develop a relationship with Fabral corp as being our supplier of steel and aluminum cladding. Through the years we have seen a number of changes occur in the “Pole Building Industry," as was formerly called. Today we’re seeing the picture change again, but the agri cultural buildings we’re designing now are far more sophisticated than ever before.